Load Rejection Test (Governor Test)The purpose of Turbine Load Rejection Test is to verify and demonstrate the governor function to sustain a load rejection in order to prevent the turbine from overspeed tripping, steady speed control at no- load operation and remain in service without any adverse effect to the turbine. The test requires skillful and appropriate operation not only for turbine , but also for boiler and its auxiliaries. Items to be confirmed for Load Rejection Test. Turbine main valves. GV no load valve position. Lube oil pump auto start test. Protective device test. Valve transfer from MSV mode to GV mode. Overspeed tripping point (1. Rejection 1 BIBLICAL COUNSELING LIBRARY QUICK REFERENCE COUNSELING KEYS Excerpt © 2007-2009 Hope For The Heart Rejection The Pain of Rejection. Nothing can. The main aim of this project is to develop a device for wireless power transfer from primary transmits to secondary receives power to run load. OPC (Overspeed Protection Controller) function. Exclusion of Interlocks (Turbine Trip due to Boiler Trip)TEST PROCEDURE*Before Load Rejection Test (one hour)1- Confirm steady condition of load operation. Perform mechanical Over Speed Oil trip Test. Perform Lub. oil pump auto start test. Before Load Rejection Test (3. Confirm that level of( Condenser , De aerator and HP/LP feed water heaters are within range. AVR in automatic mode. < Prev; Random; Next > >| Permanent link to this comic: http:// Image URL (for hotlinking/embedding): http://imgs.xkcd.com/comics/rejection.png. Rejection is the kryptonite that is killing your dating mindset, but the onus is on you and not on women. I don't care who you are or what the situation is. [Part 1 looks at advantages and disadvantages of different power supply technologies as well as the design considerations involved in choosing and evaluating a mains. 8 Analog and Mixed-Signal Products www.ti.com/aaj 2Q 2005 Analog Applications Journal Understanding power supply ripple rejection in linear regulators. The purpose of Turbine Load Rejection Test is to verify and demonstrate the governor function to sustain a load rejection in order to prevent the turbine. Load rejection in electric power system is the condition in which there is a sudden load trip in the system which cause the generation side to be over-frequency. Power and Sample Size Determination Bret Hanlon and Bret Larget Department of Statistics University of Wisconsin|Madison November 3{8, 2011 Power 1 / 31. Confirm that HP and LP Turbine bypass ( valves and Sprays ) are in automatic mode*Before Load Rejection Test (1. Exclude the interlock of (Turbine Trip due to Boiler Trip)*Before Load Rejection Test (0 minute)1- Open Circuit breaker of the Generator. If the Overspeed trip device doesn't operate contrary to expectations even when the turbine speed exceeds 1. Trip immediately the turbine. All observers shall read and record "Maximum or Minimum" of the measuring objects during transient condition. Breaking The Power Of RejectionAfter Load Rejection. Pay attention to the following points and see that there is no distinction about them.- Turbine speed- Rotor Position & Vibration- BRG temp. Vibration- Condenser Vacuum and hotwell level. Stabilization- Stabilization will be judged when turbine speed is stabilized approx. 3. GV & ICV speed control. Test Acceptance Criteria. If maximum instantaneous speed is restricted below overspeed trip limits (1. Confirmation items after Stabilizing- GVs are restored in no load position- turbine speed is controlled at near synchronous level- No abnormality is observed at electrical room and local positions. Emergency Case. If boiler trips by boiler protection , turbine shall be immediately tripped.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2016
Categories |